Pearl Neermal
Pearl Neermal Is one of the popular residential developments in tallygunge, neighbourhood. It is among the ongoing projects of pearl developer. It has lavish & though fully designed residences.
FACILITIES
- Vastu approved
- Modern elevation
- Round the clock water supply
- Solid waste management
- 24 x 7 three tire security
- 24 hours power supply
- Adequate car parking
SPECIFICATION
FLOORING
Vitrified tiles in bedroom
Vitrified tiles in living area
Anti skid Flooring in toilets
Anti skid Flooring in kitchen
Stone finish in the staircase
TOILET
Plumbing fittings of reputed make
Sanitary fixtures of reputed make
Designer wall tiles
Hot & cold water provision
DOORS & WINDOWS
Quality Limber frame with solid core flush shutters
Aluminum framed sliding window
ELECTRICAL
Concealed copper wiring in PVC conduits
MCB / ELCB with sufficient power points for household needs
Fire resistant cable
Premium earthling for electro mechanical gadgets
WHATS NEARBY
METRO
TOLLUGUNGE :2.1 KM
RABINDRA SAROBAR : 3.1 KM
BEHALA CHOWRASTA : 2.8 KM
EDUCATION
MP BIRLA FOUNDATION : 3.2 KM
NATIONAL PUBLIC SCHOOL : 260 M
SOUTH CITY INTERNATIONAL : 4.5 KM
ENTERTAINMENT/LEISURE
SOUTH CITY MALL : 4.2 KM
LAKE MALL : 3.9 KM
LANDMARKS
Rcgc Club : 2.4 KM
TOLLY GOLF CLUB : 2.5 KM
TOLLYWOOD( TINSEL TOWN) : 3.5 KM
PAYMENT SCHEDULE
- On Application – RS- 1,00,000 /- plus GST as applicable
- On Completion of foundation – 20% – Plus GST
- On Completion of ground floor casting- 15% – plus GST as applicable
- On Completion of fast floor roof casting- 15% – plus GST as applicable
- On Completion of second floor roof casting- 15% – plus GST as applicable
- On Completion of third floor roof casting- 15% – plus GST as applicable
- On Completion of brick work and flooring – 15% – plus GST as applicable
- On Possession 05% – plus GST as applicable
EXTRA CHARGES
- Electericity & transformer expenses: To be decided on or before possession and shall be common to all (as per actuals**).
- Maintenance charges: to be decided at the time of possession.
- Registration will be done after the full payment is recived. (stamp Duty, Registration cost and lawyer fee to be borne by the purchaser).
- Legal Charges: Rs. 25,000/-
**To be calculated/decided by the Developer at the time of handing over possession of the unit and/or at relevant time.
CANCELLATION CHARGES
15% of the amount paid by the client.